OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00100 | ||
PWS Name: | BEND WATER DEPARTMENT | ||
Who Was Contacted and Phone: | Heidi Lansdowne, P.E. (541) 388-5538 | ||
Contact Date: | 04/21/2010 | ||
Contacted By: | BURNETT, GARY (DWP) | ||
Contact Method/Location: | Office | ||
Assistance Type: | PLAN REVIEW | ||
Reasons: | Operations None |
||
Details: | SUMMARY: Construction status of Pilot Butte Well 4 and Shilo Wells DETAILS: These 2 wells are part of the ARRA projects. Pilot Butte Well 4 is under plan review 171-2008. The Shilo Well project is exempt from formal plan review because it is composed of equipment upgrades and pipe work in the control building and some water main work to connect to existing mains. Bend has a formal plan review exemption for main extensions and general water pipe work. I did emphasize the importance of a good raw source water sample tap, and Heidi noted that such a tap is in the plans. ACTION NEEDED: City to submit the plans for Shilo Well facilities for DWP information, particularly control building plumbing. |