Current Open Coliform Sample Schedule
(subject to change based upon future test results)
GWR: SRC-AB: 1 Assessment sample(s) per Year to be taken beginning 01/01/2013 -
DIST-A: 1 Routine sample(s) per Month to be taken beginning 03/01/2009 -
(A begin date of 01/01/1991 indicates the year the Total Coliform Rule was established)
Public water systems that use chlorine or chloramines must measure the
residual disinfectant level at the same points in the distribution system and at the same time when total coliforms are sampled.
Repeat, Temporary Routine, and Prior Coliform Sample Schedules
(Schedules in bold reflect current schedules)
GWR: 1 Triggered sample(s) to be taken and reported 05/13/2019 - 05/24/2019
1 at SRC-AB - WELL #2
-----
TCR: 3 Repeat sample(s) within 24 hours of a TC+ Routine Sample to be reported 05/14/2019 - 05/24/2019 at DIST-A
-----
TCR: 3 Repeat sample(s) within 24 hours of a TC+ Routine Sample to be reported 04/19/2019 - 04/29/2019 at DIST-A
-----
GWR: 1 Triggered sample(s) to be taken and reported 04/18/2019 - 04/29/2019
1 at SRC-AB - WELL #2
-----
TCR: 3 Repeat sample(s) within 24 hours of a TC+ Routine Sample to be reported 01/05/2018 - 01/15/2018 at DIST-A
-----
GWR: 1 Assessment sample(s) per Month to be taken 05/01/2011 - 05/31/2012 at SRC-AB WELL #2
-----
GWR: 1 Assessment sample(s) per Month to be taken 01/01/2010 - 04/01/2011 at SRC-AA WELL #1
-----
GWR: 5 Confirmation sample(s) to be taken and reported 11/09/2010 - 11/24/2010
-----
TCR: 5 Temporary Routine sample(s) per Month to be taken 02/01/2009 - 02/28/2009 at DIST-A
-----
TCR: 1 Routine sample(s) per Month to be taken 04/01/2006 - 01/31/2009 at DIST-A
-----
TCR: 4 Repeat sample(s) within 24 hours of a TC+ Routine Sample to be reported 01/07/2009 - 01/21/2009 at DIST-A
-----
TCR: 5 Temporary Routine sample(s) per Month to be taken 03/01/2006 - 03/31/2006 at DIST-A
-----
TCR: 1 Routine sample(s) per Month to be taken 02/01/2005 - 02/28/2006 at DIST-A
-----
TCR: 4 Repeat sample(s) within 24 hours of a TC+ Routine Sample to be reported 02/08/2006 - 02/22/2006 at DIST-A
-----
TCR: 5 Temporary Routine sample(s) per Month to be taken 01/01/2005 - 01/31/2005 at DIST-A
-----
TCR: 1 Routine sample(s) per Month to be taken 04/01/2003 - 12/31/2004 at DIST-A
-----
TCR: 4 Repeat sample(s) within 24 hours of a TC+ Routine Sample to be reported 12/07/2004 - 12/21/2004 at DIST-A
-----
TCR: 5 Temporary Routine sample(s) per Month to be taken 03/01/2003 - 03/31/2003 at DIST-A
-----
TCR: 1 Routine sample(s) per Month to be taken 01/01/1991 - 02/28/2003 at DIST-A
-----
TCR: 4 Repeat sample(s) within 24 hours of a TC+ Routine Sample to be reported 02/08/2003 - 02/22/2003 at DIST-A
-----
Hide schedules prior to 2021
Instructions and Notes
- If no prior sample schedules appear, then no prior schedules exist within the database.
- Schedules for Oregon very small systems might not appear. If the system is active, samples must be collected for the presence of coliform bacteria once per month or once per quarter depending on water type, seasonal operating cycle, or previous sampling results.
- If a sample tests positive for total coliform or E. coli, a minimum of 3 repeat samples must be collected. At water systems where quarterly monitoring takes place, 3 routine samples must be collected the month following one in which a routine sample tested positive for the presence of total coliform or E. coli.
Any time a sample tests positive for the presence of coliform bacteria, the system's operator should contact their regulator. For this water system, that is:
LANE CO ENV HEALTH
Sarah Puls/Cindy Reynoso/Margaret Sullivan/Zach Manning/Zach Roberts/Amy Bleekman
(541) 682-3753
drinkingwater@lanecountyor.gov