Most Recent Water System Survey | ||||
Survey Date: | Jun 21, 2023 | |||
Notification Date: | Jul 26, 2023 (35 days) | |||
Regulating Agency: | DWS (REGION 1) | |||
Survey Frequency: | 5 YR - Visit the Water System Surveys page to see the list of surveys due each year. | |||
Deficiencies: | This site visit has not been entered into the deficiency database. |
Water System Site Visit History | ||||||
Reason | Visit Date | Frequency | Next Due | Notification Date (Days after survey) |
Responsible Agency |
Comments and Deficiencies |
---|---|---|---|---|---|---|
Sanitary Survey, Finished (SNSV) | 06/21/2023 | 5 YR | * | 07/26/2023 (35) | REGION 1 | No details |
Sanitary Survey, Finished (SNSV) | 11/13/2018 | 5 YR | * | 11/29/2018 (16) | GILLIAM COUNTY | Show details |
Sanitary Survey, Finished (SNSV) | 05/14/2013 | 5 YR | * | 05/16/2013 (2) | WASCO COUNTY | Show details |
Sanitary Survey, Finished (SNSV) | 11/12/2008 | 5 YR | * | 12/02/2008 (20) | REGION 1 | Hide details |
Comments: 1. A screened vent needs to be installed on top of the new reservoir if one is not already existing. This is necessary to ensure that pressure that builds up inside the tank during filling and draining can be adequately and safely released. The screen will ensure that animals and contamination may not enter the reservoir. This site visit has not been entered into the deficiency database. | ||||||
Sanitary Survey, Finished (SNSV) | 11/18/2003 | 5 YR | * | DWP | Show details | |