OHA Drinking Water Services
Contact Report Details |
|||
PWS ID: | OR41 00324 | ||
PWS Name: | KERNVILLE-GLENEDEN-LINC BCH WD | ||
Who Was Contacted and Phone: | Mark Snyder (541) 764-2475 | ||
Contact Date: | 01/23/2008 | ||
Contacted By: | POTTS, JOHN (DWP) | ||
Contact Method/Location: | Field | ||
Assistance Type: | CIRCUIT RIDER ASSISTANCE | ||
Reasons: | N/A N/A |
||
Details: | SUMMARY: Stage 2 DBPR Assistance DETAILS: System is required to complete an IDSE Standard Monitoring Plan (SMP) for Stage 2 DBPR by April 1, 2008. The SMP involves evaluating water quality data from several sources to determine sampling sites for Stage II DBPR in 10/2009. I met with Mark and gave him an overview of the rule and conducted an initial review of water data and distribution map. I further reviewed and evaluated the data (chlorine residuals, CT report, and DBP results) to determine where representative sample sites will be located in the distribution system. I prepared a preliminary plan that I will review with Wendy Marshall R10 EPA. ACTION NEEDED: Complete SMP and review with Mark before it is submitted to EPA. |