System Information | Schedule Counts |
Status: Active System Type: Community Population Served: 32 | Active: 2 Inactive: 0 Expired: 1 Show Expired |
Routine Sampling Schedules For Chemicals | ||||||||
Facility ID |
Name | Status | Test Group | Samples Required |
Sampling Interval |
Start | End | Notes |
DIST-A | DISTRIBUTION SYSTEM | A | LEAD & COPPER | 5 | 6 Months | 07/01/2022 | Open | Collect samples at cold water, drinking water taps. |
DIST-A | DISTRIBUTION SYSTEM | A | STAGE 2 DBP | 2 | Yearly | 01/01/2022 | Open | Collect two dual sample sets between June 1 and September 30, one at the location with highest expected HAA5 and one where highest TTHM concentrations are expected. |