Most Recent Water System Survey | ||||
Survey Date: | Aug 29, 2024 | |||
Notification Date: | Sep 09, 2024 (11 days) | |||
Regulating Agency: | DWS (REGION 1) | |||
Survey Frequency: | 3 YR - Visit the Water System Surveys page to see the list of surveys due each year. | |||
Deficiencies: | This site visit has not been entered into the deficiency database. |
Water System Site Visit History | ||||||
Reason | Visit Date | Frequency | Next Due | Notification Date (Days after survey) |
Responsible Agency |
Comments and Deficiencies |
---|---|---|---|---|---|---|
Sanitary Survey, Finished (SNSV) | 08/29/2024 | 3 YR | * | 09/09/2024 (11) | REGION 1 | No details |
Water Treatment Plant Site Visit (TRTP) | 08/29/2024 | 6 MN | 02/28/2025 | REGION 1 | No details | |
Sanitary Survey, Finished (SNSV) | 06/10/2021 | 3 YR | * | 07/06/2021 (26) | REGION 1 | Show details |
Water Treatment Plant Site Visit (TRTP) | 06/10/2021 | 6 MN | 12/10/2021 | 07/06/2021 (26) | REGION 1 | No details |
Sanitary Survey, Finished (SNSV) | 12/19/2017 | 3 YR | * | 02/16/2018 (59) | REGION 1 | Show details |
Water Treatment Plant Site Visit (TRTP) | 12/19/2017 | 1 YR | 12/19/2018 | 02/16/2018 (59) | REGION 1 | No details |
Sanitary Survey, Finished (SNSV) | 11/20/2014 | 3 YR | * | 03/04/2015 (104) | REGION 1 | Show details |
Water Treatment Plant Site Visit (TRTP) | 11/20/2014 | 6 MN | 05/20/2015 | 03/04/2015 (104) | REGION 1 | No details |
Sanitary Survey, Finished (SNSV) | 11/21/2011 | 3 YR | * | 01/20/2012 (60) | DWP | Show details |
Water Treatment Plant Site Visit (TRTP) | 11/21/2011 | 6 MN | 05/21/2012 | 01/20/2012 (60) | DWP | Show details |
Sanitary Survey, Finished (SNSV) | 02/22/2008 | 3 YR | * | 11/26/2008 (278) | DWP | Hide details |
Comments: The deficiencies noted are as follows: Surface Water Treatment Deficiencies Monitoring 1. Improve treatment plant to achieve 2.0 log giardia removal credit. Major issues include: inoperable flocculation paddles, failing to meet turbidity standards, undersized sedimentation process. Prepare to enter a Bilateral Compliance Agreement with DWP to set a schedule to resolve these deficiencies during a mutually agreed upon timeline. 2. Turbidity compliance standards are not met. 3. No means to accurately determine disinfection contact time under peak flow and minimum storage conditions. - You need an effluent flowmeter after the clearwell and the contact time used for CT calculations must be based on the results of a tracer study. 4. In-line and benchtop turbidimeters must be calibrated according to factory specifications at least quarterly. 5. Turbidity profile not conducted at least quarterly. Finished Water Storage Deficiencies Distribution Deficiencies Monitoring Deficiencies Management and Operation Deficiencies | ||||||
Sanitary Survey, Finished (SNSV) | 09/28/2004 | 3 YR | * | DWP | Show details | |